Gravity Relief Sewer beneath Rahway City Streets and the Rahway River
  Contract 156
Work included the microtunneled installation of approximately 5,100 LF of 42” polycrete pipe (51” OD) within city streets through mixed ground conditions plus 670 LF of 48” RCP (60” OD) with T-Lok liner under the Rahway River through shale bedrock. The work required the construction of eleven shafts and the installation of ten 84” and 96” diameter manholes up to 26’ deep, the open cut installation of 42” DIP to accommodate a significant elevation change, and the construction of a cast-in-place concrete diversion chamber.

Location: Wall St., East Milton Ave., Barnett St. and East Grand Ave., Rahway, NJ.

Date: 2006

Owner: Rahway Valley Sewerage Authority

Contact Information:
Mr. Michael Brinker, Jr.
R.V.S.A. Executive Director
1050 East Hazelwood Ave
Avenel, NJ 07065
(732) 388-0868, x-215